Services
- HVAC installation
- Plumbing installation
- Laboratory gas installation
- Acid waste installation
- Chiller installation
Installation of laboratory gases to include oxygen, nitrogen, compress air, vacuum air.
Plumbing systems piping included HW, CW, acid waste, wastewater, and de-ionization.
Equipment installed: gas water heaters, air compressors, vacuum pumps, and circulating pumps, plus hundreds of fixtures including emergency eye wash stations, toilets, lavatories, and showers.
Regional Energy Plant addition included adding 1500-ton capacity centrifugal chiller and matching cooling tower to support campus infrastructure.