The SPC Mechanical BIM department takes pride in using the latest software and technology to develop mechanical and plumbing documents for cooperation with the design team as well as other trades.
The SPC coordination team uses the BIM process to replicate conditions of the structure before the actual construction begins. The creation of this 3D model allows the building to be designed collaboratively and tested virtually.